Well, week 2 has come and gone. The construction and plastering are complete. I've spent most of the weekend painting. All I have left to do is paint the Soffit.
Here are some pictures from last week in the 1/2 bath, after demolition, before plastering and painting.
After plastering and painting:
Here are some shots of the Kitchen throughout the week:
Doesn't this wall in the living room look much better plastered, instead of that dark paneling that used to be there?
Week 3 is the flooring installation.